Hello one and all from the Highlands of Scotland!
I have recently taken the role of IT Manager for a growing corporate construction firm which is growing fast.
I’ll give you a quick idea of the environment;
- Two sites, Both with a singlephysical server (2008 and 2008 R2) running Exchange, SQL, Data, Printers. Thereis also a Terminal Server on both sites we could backup.
- In the near future I will beintroducing a second server into one site and transferring SQL to it along with printing.
- Total data for both sites isaround 4TB.
- Currently our backup runs onBackup exec to tape on both sites run by the same server to external tapedrives. We two weeks complete retention and then tapes going back three months from every last Friday of the month.
- The sites are connected via aVPN over a civilian WAN. The Connection at site A is an EFM 30meg up and down...