Hey all,
Over the weekend I had to failback one of our VMs from a replica back to it's original production location. This worked great. However, when the replica job ran last night, it said the replica was locked. And, when I went into Veeam this morning, I can see that the failback needs to be committed. This will be my first time doing this, and it's during work hours now, so I'm a little gun shy to commit it. Should there be any downtime while this happens? If so, how long should it take?